How to Build and Compare Clinical Trial Budgets
A practical guide from the first estimate to CRO selection
Yuri Kovalev | Budgets and Proposals Lead, Cromos Pharma
Two contract research organizations (CROs) review the same Phase II protocol synopsis. One quotes $2.8 million and the other $3.2 million. The lower quote excludes the central laboratory, includes less vendor oversight, and assumes five more months of enrollment. How much of that $400,000 difference will remain once the sponsor prices the full study?
Biotech teams often need an early estimate to raise capital, choose study countries, or plan for the next clinical milestone. The estimate is more useful when it shows how the study would run, who would do the work, and which assumptions could materially change the cost. Those details also make proposals easier to compare when the study goes out to bid.
Start with the decision the budget needs to support
A fundraising estimate may need to show the capital required under several plausible study plans. If the priority is reaching a clinical milestone by a particular date, site activation and enrollment deserve more scrutiny. Agree on the decision first, then choose a base case and identify which assumptions to test.
Input | What to establish |
Study design | Phase, population, eligibility, endpoints, enrollment target, and schedule of events |
Recruitment | Screen failures, dropouts, enrollment per active site, and supporting feasibility evidence |
Geography | Candidate countries, patient allocation, site counts, and activation timelines |
Operations | Monitoring, study systems, vendors, and division of responsibilities |
A single additional visit can affect investigator payments, laboratory charges, data collection, and monitoring. If two visit schedules are under consideration, price both. For each major assumption, record its source, whether it is confirmed, and what would trigger a revision.
Build a budget the sponsor can defend
Build monthly site activation and enrollment curves by country. Start with regulatory and contract lead times, then apply site-level recruitment rates, ramp-up, screen failures, and dropout. Translate the resulting patient and visit counts into units the sponsor can reconcile to the protocol.
Cost basis | Model and check |
Fixed or milestone | Database build, regulatory submissions, and deliverables. Confirm invoice milestones. |
Time or staffing | Project management, clinical trial management, and hosting. Show staffing by role and month, and distinguish recurring fees from work billed per visit. |
Volume | Investigator visits, monitoring visits, lab kits, imaging reads, and adjudication. Show unit prices, quantities, and minimum commitments. |
Drug supply | Identify sponsor-owned manufacturing and release costs, then price packaging, labeling, depot storage, shipping, resupply, and returns. Model wastage and expiry. |
Provisional | Record the quote owner, scope, date, validity, and expected replacement date for each allowance. |
Build low, base, and high cases using explicit changes to enrollment, activation, country mix, and vendor pricing. Keep the clinical scope consistent or identify where it changes. Show the change in cost, milestone timing, and peak cash need for each case.
Phase cash by month or quarter using site advances, vendor deposits, invoice milestones, payment terms, and investigator payment cycles. Show cumulative funding needed through the next decision point and the exposure if that milestone slips. Keep contingency separate from the base estimate and assign an owner to each risk.
How six more sites could reduce total study cost
Consider an illustrative Phase II trial targeting 180 patients. Both scenarios use the same protocol, schedule of events, and CRO scope of work. They differ in geography, site count, and assumed enrollment duration.
Planning parameter | Scenario A | Scenario B |
Geographic strategy | Germany, France, Spain | Germany, Poland, Romania |
Planned sites | 18 | 24 |
Target enrollment | 180 patients | 180 patients |
Assumed enrollment duration | 14 months | 11 months |
Site start-up and management | €0.72M | €0.84M |
Operations costs that vary with duration | €1.26M | €0.99M |
Other study costs | €1.62M | €1.47M |
Total estimated budget | €3.60M | €3.30M |
Scenario B adds €120,000 in site start-up and management costs. The shorter enrollment period reduces modeled operating costs by €270,000, and the model assumes €150,000 less in other study costs. Together, those changes produce the €300,000 difference. In a working budget, trace the assumed €150,000 reduction to specific cost lines.
Validate the 11-month enrollment plan against projected activation dates and realistic enrollment per active site. Disease prevalence can guide country selection. Eligibility, diagnostic requirements, competing trials, and patient flow at individual sites determine how many patients the study can reach.
The example implies €90,000 in duration-related operating costs per month. Holding that monthly cost and the other cost categories constant, a three-month enrollment delay would reduce Scenario B’s modeled advantage from €300,000 to €30,000. For a live budget, reprice recurring staffing and hosting, visit-based work, and vendor minimums separately.
How to compare two CRO proposals
In this second illustrative example, both CROs review the same Phase II protocol synopsis and enrollment target. Their quotes reflect different trial plans and services.
Planning assumption | CRO A | CRO B |
Countries | 3 | 5 |
Planned sites | 20 | 30 |
Enrollment duration | 15 months | 10 months |
Monitoring approach | Primarily on-site | Hybrid |
Central laboratory | Excluded | Included |
Patient recruitment support | Limited, with no dedicated recruitment program | Dedicated strategy |
Vendor oversight | Partial | Full |
Initial quoted budget | $2.8M | $3.2M |
Start with each quote. Add required services the sponsor would pay for separately, then adjust both budgets to cover the same scope. For CRO A, price the central laboratory and clarify which vendor oversight activities the sponsor would cover. If dedicated recruitment support is required, price it consistently across both bids.
The adjusted totals are equal if net additions to CRO A exceed net additions to CRO B by $400,000. Keep operational differences beside the adjusted totals. Ask CRO B for the activation schedule and enrollment assumptions behind its ten-month plan. For monitoring, compare planned visit frequency, remote activities, and scope of review.
Carry the assumptions into the request for proposal
A request for proposal (RFP) should give bidders a common basis for pricing and room to recommend a different way to run the study. Separate confirmed requirements from base-case assumptions. Ask bidders to describe proposed changes and show how they affect cost, timing, and delivery.
Give bidders a common enrollment target and schedule of events. Ask them to price the same core services and identify investigator payments, vendor costs, and other pass-through expenses separately. If a bidder recommends a different country mix or monitoring approach, request a separate scenario and the feasibility rationale behind it.
Allow time for clarification questions and vendor quotes. Ask bidders to identify provisional costs and exclusions and specify who owns each activity. Share the evaluation criteria up front so bidders know how you will weigh cost, team experience, feasibility, and timeline.
A sponsor checklist before committing to a budget
- Confirm scope and ownership. Identify who performs and pays for each major activity, including investigator payments and third-party services.
- Test the enrollment plan. Check activation dates and recruitment per active site. Model the cost of a delay.
- Put proposals on the same basis. Price sponsor-paid services and exclusions before comparing totals. Keep differences in timing and delivery visible.
- Flag provisional costs. Record which estimates still need vendor quotes or feasibility input, and revisit them when the protocol or study plan changes.
Price changes before approving them
An amendment can affect work already completed as well as future visits. Adding a visit may change investigator grants, monitoring, the electronic data capture system, labs, and patient logistics. Eligibility changes can alter screen failures, site training, enrollment forecasts, and drug supply. For each change, identify the patients and countries affected, reprice the incremental work, and update the schedule and cash forecast.
Illustrative added visit | Incremental cost |
Investigator payments for 120 visits at $300 | $36,000 |
Laboratory kits and processing for 120 visits at $125 | $15,000 |
Monitoring for 40 additional hours at $120 | $4,800 |
Electronic data capture change and testing | $6,000 |
Total for the four modeled items | $61,800 |
The figures are modeling inputs. In a live estimate, check whether the change also requires ethics submissions, consent updates, retraining, additional shipments, or vendor change fees. Adding a country similarly calls for its own regulatory, translation, contracting, and supply estimate.
Manage currency exposure and pass-throughs
Record the currency and base date for each material cost. Apply contractual indexation only to eligible rates and periods. Test exchange-rate movement separately from local price escalation, and confirm which party carries each exposure. If site activation slips, rephase the affected costs and check for price resets or expiring quotes.
Maintain a pass-through register with an owner, quantity, unit price, currency, markup, and approval limit for each item. Track actual and committed spend against forecast for investigator payments, shipments, imaging, electronic patient-reported outcome licensing, and translations. Reconcile vendor invoices to units delivered and require written approval for material changes before committing spend.
Questions to ask before awarding the trial
Area | Evidence to request |
Feasibility and start-up | Show the enrollment and site activation curves by country. Explain patient-flow evidence, regulatory and contract lead times, initiation approach, and the plan for underperforming sites. |
Staffing and oversight | Provide hours or full-time equivalents by role and period, expected seniority, project manager and clinical trial manager allocations, and backup coverage. |
Monitoring | Quantify planned on-site and remote visits, source data verification scope, and risk triggers that would increase activity. Identify how additional work is priced. |
Systems and vendors | Clarify who supplies and pays for data capture, trial management and filing systems, safety reconciliation, and vendor oversight. Show quote validity and any usage minimums. |
Quality and delivery | Ask for relevant delivery metrics and how the proposed team has addressed comparable audit findings or recurring quality issues, where shareable. |
Commercial terms | Reconcile units, rates, exclusions, pass-through markups, escalation, currency assumptions, and change-order triggers against the common scope. |
Request the same assumptions and pricing template from each bidder, then keep recommended alternatives separately priced. During clarification, ask which assumptions would change the bid most and which the bidder can substantiate before award.
If you’re comparing CRO proposals or preparing an RFP, Cromos Pharma’s Budgets and Proposals team can help you put the estimates on the same basis. Contact us at inquiry@cromospharma.com.